Intent – To eliminate or minimise the risks of fatalities, injuries and events arising from transport tasks (Logistics) at Laing O’Rourke worksites.
Critical Controls
- CoR Risk Assessment conducted and included in Project or Supply Chain Project Risk Assessment
- CoR Safe Systems of Work developed and implemented (e.g. Plans, Procedures, SWMS, Work Instructions – Site or Supply Chain developed)
- Assurance and reporting activities are implemented and monitored
- Roles and responsibilities are defined and communicated
- Training needs analysed and training conducted
- CoR requirements communicated
- Vehicles speeds are monitored and reviewed for compliance
- Operators fatigue is being managed (over 11 seats including driver or > greater than 12 T) consistent with the site fatigue management requirements.
- Load mass and dimensions within vehicles combination limits
- Load restraint is effective and adequate for the load being transported. Minimum compliance 2018 National Transport Commission Load Restraint-(NTC LR) Guide.
- Vehicles are road worthy (defect free and maintenance current)
For all supporting documentation please refer to PS Chain of Responsibility